Media reports

The unsung heroes in the engineering machinery

2022-01-21 22:10:00

blob.png

streets around the phoenix mountain in chongqing wulong canteen collapse accident, caused the broad masses of close attention.

after the accident, medical workers and firefighters rushed to the scene to rescue.

in the process of rescue, engineering machinery, as a relief force to be reckoned with in the has played a key role.

nantong huanli

chongqing canteen collapse

engineering machinery and equipment to be present after immediately began to break down the search and rescue, for 2 days, 10 were rescued trapped personnel.

disaster ruthless, people love.When disaster strikes, engineering robot is always the first to rush at the front.

in the major disaster accidents occurred in recent years, engineering machinery has become the backbone of the rescue ranks.

nantong huanli

wuxi highway bridge accident

a highway bridge collapsed in wuxi city, jiangsu province, at the time of the accident of engineering machinery is also the first time to the scene.

a dozen cranes, excavators and other equipment to positive strain of rescue work.

nantong huanli

accident comes off guard, no chance for anyone.

at the scene of the rescue and relief workers to rest, continuous rescue, time is too important to rescue people trapped in.

the scene without too many voices, only the sound of the relief and machine equipment to rescue command.

nantong huanli

after over 10 hours, successfully saved the last one was pressure in the car.

"bear the ears and row, a winner."Engineering robots have responsibility, have bear.

where there is a need, there is the figure of construction machinery.

in henan heavy rain

in July 2021 in henan under the rainstorm.

the whole city, have been mud yellow water, the high-speed rail service, city traffic completely paralyzed.

the road changes "ocean", the vehicles on the road.

nantong huanli

disaster is ordered.A time of crisis, engineering machinery companies organize rescue teams immediately rushed to the flood-fighting first line.

involved in fighting and emergency operations.Excavators, loaders, cranes and other construction machinery equipment between people on duty.

nantong huanli

with its tall body, strong power, and special mechanical structure become the hardcore of the flood relief.

nantong huanli

engineering robots are not afraid of danger, afraid tired, continuous in the flood fighting for more than 20 hours.

into the disaster area center to find and rescue trapped people.The transfer of the affected people tens of thousands of people.

risk flash floods, road repair, as soldiers and rescue vehicles into the disaster area cleared.

in life and death moment, engineering machinery is the life-saving straw.

wuhan outbreak

to go where it is needed most, the most dangerous place.

in December 2019, a sudden outbreak of wuhan into an empty city.

hubei wuhan epidemic raged, daily confirmed and suspected cases continue to rise.

in hospitals in wuhan city crowded, one bed is hard to find.Be badly in need of special hospital new crown pneumonia patients.

nantong huanli

but then during the Spring Festival holidays, wuhan has also "city", the worker have a holiday, workers returning home and factories.

there is no so much the mechanical construction of the hospital.

and life the "death", especially to build a fire mountain hospital within ten days,

build up a thor hill hospital 12 days.

nantong huanli

one party hard, p plus support.

engineering robots on hearing the news all over the country have joined to the "battlefield".

"I is close to wuhan, I can go."

"I in hubei, well-documented."

"I in wuhan, to immediately."

just eight hours of time, the site is packed with support from all over the country to the builder.

nantong huanli

construction vulcan hill hospital to cuhk than a lot of difficulty, is not only the problem of short time limit, the construction of the environment is not ideal but also added a lot of difficulty to the work.

vulcan hill hospital was built on a piece of bog and bake, here the foundation of nearly 10 meters, the construction environment is not ideal.

on this site construction personnel need seven smooth out the size of a football field space, light to dig soil can pile out of a hill, the quantities to estimate need at least a month or two.

and has a high tension line space above, on the ground, water and gas pipe, such as moving to task is also a big problem.But these are not hid from colleagues of construction machinery.

nantong huanli

their operations in a row, not sleeping, every day, only three or four hours to rest.

tired, some people depend on Chinese prickly ash refreshing water.

there are some people who are really insist on not bottom go to, just lying on the ground a nap, wake up to fight on.

nantong huanli

vulcan hill hospital covers an area of 70000 square meters, construction area of 34000 square meters, 1000 beds.

the thor hill hospital covers an area of 220000 square meters, construction area of 79900 square meters, 1600 beds.

from construction period normally for at least two years of time compression to 10 and 12 days, many people said: "this is almost a mission impossible!"

nantong huanli

but China did, builders did, engineering machinery colleagues did.

nantong huanli

we always said China has "infrastructure slasher".What the magic is, in fact, all is a simple and kind NiXingZhe.Is their self-sacrifice, perfecting self, work together to complete the mission impossible.

unsung heroes

each era, has a different hero.Embodiment in the disaster came, "the protector of life" engineering robots, is a great hero, they built a life of obscurity "safety barrier", they are the unsung heroes of the contemporary society.

Home
Product
News
Contact