Dali railway station station renovation project feasibility study report approved
Dali autonomous development and reform commission, western yunnan railway co., LTD. :
Dali autonomous development and reform commission, western yunnan railway co., LTD. Of the existing railways are about to submit the Dali railway station station building of project feasibility study report instruct "(great change basis [2022] no. 79).Studies, we reply as follows:
a, to strengthen the integration of passenger railway station and urban traffic, enhance the level of station traffic and passenger railway station services, Dali principles agreed to implement both railway station station promotion project (project code: 2020-532903-53-01-045218).
2, the main construction contents
transitional project implementation, to dismantle, both the station building and combined with the city facilities reconstruction on the site of the new station building, etc.
(1) of the transition period, new project with a total construction area of 6400 square meters.Among them, the new temporary transition station building construction area of 5450 square meters.
(2) to remove a total construction area of 18064.4 square meters.Among them, both the station building construction area of 13500 square meters.
(3) the new station building first floor overhead, two, three layer station waiting, four layers setting station auxiliary.The newly built a total construction area of 40675 square meters, among them, the station building construction area of 21000 square meters, construction area of 18725 square meters stilt floor and passenger service.
(4) synchronous construction related facilities, such as electric power, communication, information, water supply and drainage engineering and transitional facilities.
3, investment estimation, capital source and construction schedule
project estimation with a total investment of 636.1113 million yuan, capital ratio of 20%, the capital of Dali prefecture state, Dali economic and technological development zone, Dali 4:4:2 according to the proportion of share.The rest of the money to use domestic bank loans, etc., by the project owner unit to raise.
Dali prefecture of traffic transport units for the project owner.Construction period 2 years.
4, the next step work requirements
(a) approval in strict accordance with the requirements of the implementation of the funded, involving the local government fiscal spending, in every year into the local fiscal budget spending plans, establish a stable mechanism, to ensure that project funds in place timely.Project financing mode, financing source shall not be adjusted freely.It is strictly prohibited in violation of the provisions of new government debt, effectively guard against local government debt risk.
(2) of deepening the research on plan, implement the safety production requirements.The next stage, should be adjusted to optimize the construction features, in combination with geological exploration report, deepen the station building design of the main structure, perfect the fire water system, such as power supply design scheme.According to wang group related regulations, give full consideration to near YingYeXian construction organization, protection, and the transition scheme, and the passenger organization in the process of the construction and project coordination.Project unit should strictly carry out the emergency and fire departments, carry out measures of fire control, flood control safety production and ensure the operation safety, passenger safety, reduce the reconstruction project of the passenger, the impact of the society.
(3) strict implementation of the ecological environment protection requirement.Green energy-saving design and construction, and further optimize the engineering measures, strengthen the supervision of process and effective prevention and control of adverse environmental impacts.To carry out the ecological protection and soil and water conservation measures, in accordance with the relevant administrative licensing formalities, etc.
(4) strengthen the social stability, the resolving measures to prevent risks, make effective emergency response plans, and guarantee the smooth implement of project construction.
(5) to do this project, linking to the surrounding road network as a whole the city public transport interchange facilities construction, strengthen the railway station and the city proper and other important hub between fast connection, convenient direct, improve the efficiency of comprehensive traffic as a whole.
(6) strictly implement the relevant state regulations on the bidding and public bidding according to regulation in accordance with the law.
(7) it is strictly prohibited in this project, in the name of the construction technology business houses a lift new government building projects, it is forbidden to change technical buildings for business purposes, shall not be in the project construction of the administrative office premises.
5, if you need this project examination and approval document to determine the content of the adjustment, please timely report in written form to by commission, and in accordance with the relevant regulations.
in yunnan province development and reform commission,
on February 28, 2022,