After we received the customer in the parking lot project requirement, the contract will sign or have signed the contract, usually do on-site investigation, main is to look at the scene environment, and the construction matters specified in the relevant personnel.
the exploration of the main contents are as follows:

1. Contact customer project manager and site construction, to know whether have special requirements, at the same time introduce our project director, clear work, do a good job in communication for later construction of communication;
2. Determine the water utilization of project construction, tools, materials, location, confirm the custody head;
3. Determine the location of the equipment, make sure put professional and reasonable, human nature, make sure equipment put the position, to determine the course of line pipe, length, material, etc., draw the drawings, signed by the customer to confirm;
4. Determine the date and time limit for a project construction;
5. After confirm the above a few content, we can do the parking lot project construction plan.Construction scheme is mainly the construction plan, construction method and technical guarantee, we will not discuss here.