Intelligent parking system in zonetie are coil which should be paid attention to when cutting
2022-04-11 00:00:00
before cutting ground sense coil, first of all, we must ensure that all around is about 50 cm to small amount of metal, such as manhole covers, rain ditch cover plate, etc.;Secondly in the cutting line 1 m range do not have high voltage line;Cutting multiple ground sense coil, moreover, if the gap between the coil and the coil is greater than 2 m, otherwise it will interfere with each other.In our construction, make sure the coil groove depth and width to the average consensus, avoid the deep and shallow, the wide and narrow situation, cutting groove can’t ensure that after the coil is sundry, can’t have a good thing, in particular, near the island, to avoid "lead on the road.
when installing a ground sense coil in order not to let the groove lines over time by hard cutting edges and corners, we’d better in grooves spread some fine sand;Slot wire should try not to have stress, round pressure to the bottom of the channel;Line groove lay good line, in order to avoid the coil skins by high temperature melting, we try to build a layer of sand on the paved the coil, and finally, repeatedly with melting bitumen of pouring, and road surface level, so that we will finish the ground sense coil cutting.
sense coil although is a very small part in the parking lot, but when the cutting must find normal parking system manufacturers, it not only the relationship between the normal operation of the parking lot, also affects the service life of car parking system.